About NEWARE

Engineering battery test systems since 1998

Founded in Shenzhen, NEWARE works on one subject: measuring how a cell behaves. Testing platforms, laboratory software, chambers, formation systems and fixtures are developed under the same roof so the data path stays continuous.

1998

Founded

1,000+

Patents & software copyrights

59,972+

Customers served

549,741+

Units shipped

ISO 9001

Quality management system

What we build

Six capabilities around one measurement chain

Tests move from material research to cell characterisation, module validation and pack end-of-line. Each capability below exists because that chain breaks if one stage is measured differently from the next.

  • 01

    Battery testing systems

    CT/CTE-4000, CT/CE-5000, CE-6000, CT/CTE-8000 and CT-9000 families for coin, 3C, EV and storage cells.

  • 02

    Smart laboratory

    LIMS covers sample registration, test scheduling, equipment status and reporting with traceable data.

  • 03

    Environmental chambers

    High-low temperature, constant temperature, high temperature and explosion-proof chambers sized for cell and module work.

  • 04

    Formation & grading

    Prismatic and pouch cell formation and grading systems for volume production lines.

  • 05

    Fixtures & accessories

    Prismatic, cylindrical, pouch, blade and pressure fixtures, calibration tooling, AUX channels and internal resistance meters.

  • 06

    Automation projects

    More than 60 back-end automation line projects delivered for prismatic, pouch and cylindrical cell production.

Milestones

A continuous line of platforms, not one product

Selected public milestones from 1998 to 2025. Only published events are listed.

  1. 1998

    Neware founded in Shenzhen

    Battery testing became the single focus of the company from its first year.

  2. 2004

    ISO 9001 certification

    Quality management system certified; SAP introduced for business operations.

  3. 2008

    BTS-4000 architecture

    Pulse and DCIR testing added to the fourth-generation test platform.

  4. 2012

    LIMS and CNAS accreditation

    Laboratory information management released against ISO 17025 practice; CNAS accreditation obtained.

  5. 2015

    BTS-9000 at scale

    High-precision platform deployed widely and automation line projects started.

  6. 2022

    In-situ testing and BT-9562

    CT-8002 in-situ battery testing system and BT-9562 high-precision internal resistance meter released.

  7. 2023

    Networked service system

    Connected service workflow launched, covering repair requests and progress tracking.

  8. 2024

    High-voltage and EOL systems

    CE-6000 1500 V, EOL test systems, CT-9008-5V15A and CE-4008Q-5V30A introduced.

  9. 2025

    CE-6000 Standard, Pro and 3000 V

    CE-6000 portfolio expanded, CT-9008-SD self-discharge tester and LIMS 3.0 released.

Inside the plant

Where the equipment is built and checked

Photographs are reserved for the official facility images. The placement below marks where each one belongs.

SMT assembly line
Calibration laboratory
Final assembly

Want the full specification package for a project? Send the test plan and the cell format.

Contact Sales

Talk to a person

Want to know more models? Contact us

Selection, quotation, technical parameters and after-sales support all start from the same contact. Include the cell format and current range you work with for a faster answer.

WeChat

Scan to add on WeChat

WhatsApp

Scan to open WhatsApp

QQ 1768647363

Scan to add on QQ

Each card takes its own image. Phone, WhatsApp and WeChat share the same number.